Multi-Line Wind Blade Factory Simulator

Visualize flow across Pre, Main, and Post-Molding lines.

Global Controls

Global Metrics

Simulation Time: 0.00 min
Line 1 Completed: 0
Line 2 Completed: 0
Line 3 Completed: 0
Queue (1->2): 0
Queue (2->3): 0
Cycle Time (L1): 0.00 min
Cycle Time (L2): 0.00 min
Cycle Time (L3): 0.00 min
System Cycle (Bottleneck): 0.00 min

Simulation Visual

Line 1 Parameters (R -> L)

Add Workstation (Line 1)

Workstation Configuration (Line 1)

Name L (m) HC Del

No workstations added.

Line 2 Parameters (L -> R)

Add Workstation (Line 2)

Workstation Configuration (Line 2)

Name L (m) HC Del

No workstations added.

Line 3 Parameters (R -> L)

Add Workstation (Line 3)

Workstation Configuration (Line 3)

Name L (m) HC Del

No workstations added.

Alert Message